MIL-DTL-46063H
2.3 Non-Government publications. The following documents form a part of
this specification to the extent specified herein. Unless otherwise specified,
the issues of the documents which are DoD adopted are those listed in the issue
of the DoDISS cited in the solicitation. Unless otherwise specified, the issues
of documents not listed in the DoDISS are the issues of the documents cited in
the solicitation (see 6.2).
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
ANSI H35.2 - Dimensional Tolerances for Aluminum Mill Products (DoD adopted)
(Application for copies should be addressed to the American National Standards
Institute, 11 West 42nd Street, New York, NY 10036.)
AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)
ASTM B557
Tension Testing Wrought and Cast Aluminum and Magnesium-
Alloy Products (DoD adopted)
ASTM E34
Chemical Analysis of Aluminum and Aluminum-Base Alloys
(DoD adopted)
ASTM E227
Optical Emission Spectrometric Analysis of Aluminum and
Aluminum Alloys by the Point-to-Plane Technique (DoD adopted)
ASTM E607
Optical Emission Spectrometric Analysis of Aluminum and
Aluminum Alloys by the Point-to-Plane Technique, Nitrogen
Atmosphere (DoD adopted)
ASTM E716
Sampling Aluminum and Aluminum Alloys for Spectrochemical
Analysis
ASTM E1251
Optical Emission Spectrometric Analysis of Aluminum and
Aluminum Alloys by the Argon Atmosphere, Point-to-Plane,
Unipolar Self-Initiating Capacitor Discharge (DoD adopted)
ASTM G38
Making and Using C-Ring Stress-Corrosion Test Specimens
(DoD adopted)
ASTM G47
Determining Susceptibility to Stress-Corrosion Cracking of
High Strength Aluminum Alloy Products (DoD adopted)
(Application for copies should be addressed to the American Society for Testing
and Materials, 100 Barr Harbor Drive, West Conshohocken, PA 19428-2959.)
2.4 Order of precedence. In the event of a conflict between the text of
this document and the references cited herein, the text of this document takes
precedence. Nothing in this document, however, supersedes applicable laws and
regulations unless a specific exemption has been obtained.
3.
REQUIREMENTS
3.1 First article. When specified in the contract or purchase order (see 6.2)
and before production has commenced, samples of the specified item shall be made
available to the contracting officer or his authorized representative for approval
in accordance with 4.3.1. The approval of the first article samples authorizes
the commencement of production but does not relieve the supplier of responsibility
for compliance with all applicable provisions of this specification. The first
article samples shall be manufactured by the process proposed for use on
production.
2
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business